Final Debris Search and Topsoil Application

15:25
27:37
94.2K views

At 15:25 in

How we Remove a Swimming Pool

What happens here

Before completing the backfill, the operator uses the skid steer's 'beak' attachment to 'fish' for any missed concrete pieces at the bottom of the pool. By repeatedly ramming the forks into the soil, they check for hidden debris. This ensures that no large concrete pieces are left buried, which could cause future settlement issues. After this, a final layer of pulverized screened black dirt is imported and spread over the compacted subgrade.

Goal: Ensure no hidden concrete debris remains and apply topsoil for landscaping.

Tools and materials

  • 'Beak' or 'Forks' Attachment N/A — Probing the soil for hidden concrete debris
  • ASV RT-75 Skid Steer Loader ASV — Fishing for debris and spreading topsoil
  • Pulverized Screened Black Dirt N/A — The final layer of topsoil for landscaping

What they say

Hide

is on what I call fishing he's going to be going down into the bottom of that swimming pool and sticking those tines into the dirt so that he can see if there's any pieces of concrete that he may have missed or left behind now we have a pretty good idea where all the concrete is but we never know if there might be more concrete because we weren't there during the construction phase of the swimming pool so we'll go in and we'll just start ramming the forks into the soil over and over again just searching for anything that we left behind because our job is to get that all out now some cities actually will allow you to bury the concrete and I don't recommend that for so many reasons for one if we have a big pile of concrete just shoved into the bottom of that you're going to have settlement I want you to think of it like throwing a bunch of Legos into a container you're gonna have void spaces in between there because you can't pack them in tightly we want to make sure that we're able to pack that soil in tightly into the right density so that we don't have the top of the grade when we're all done in three to four years looking like a swimming pool all uneven again we want to be able to place that soil as evenly as possible that way we'd get the best long-lasting reason so Todd is what we call the picker on the job site his job is to help the machine operator make sure that no debris gets buried or left behind so he's also got to watch out for the equipment running and not just assume that the operator sees them it's a rule inside of our company that you never assume that the operator sees you off you'll always assume that he does not see you and I want to make sure I don't know I just try not to I just try to keep these guys safe so any debris that the machine doesn't pick up and get sorted and separated Todd has to go grab and put in the appropriate pile a Blaine is gonna go fishing again for buried footings behind the sidewalls now the concrete that's buried behind the sidewalls is not these massive giant pieces but it's still there and in our the way we've been it it still needs to come out we don't want to leave anything left behind so he's gonna start fishing and if you find something and then he's gonna put it in the appropriate pile but this is part of the process that takes us longer to do than just pushing in a swimming pool filling it over and walking away from it before we start a swimming pool project like this we always want to make sure that all…