Re-establish and Final Grade the Plaza Sub-base
5:50
7:58
14.8K views
At 5:50 in
How to price Landscape Design on Commercial Projects
What happens here
After waterproofing and drainage layers are installed, the plaza area is re-established. This involves backfilling with the removed soil or new suitable material, and then grading and leveling the surface to its desired elevation and slope. Proper grading is critical to ensure surface water runoff is directed away from the building and into the new drainage system, preventing future infiltration. The speaker emphasizes that a properly functioning retaining wall should show uniform 'weeping' across its surface, confirming effective drainage throughout the sub-base.
Tools and materials
- Compaction Equipment
- Grading Equipment (e.g
- Box Blade
- Motor Grader)
- Surveying Equipment
- Fill Soil N/A