Execute Sub-base Soil Removal and Initial Drainage

3:30
7:58
14.8K views

At 3:30 in

How to price Landscape Design on Commercial Projects

What happens here

The process involves physically 'shaving off' or peeling back the existing soil from the plaza surface down to the garage's roof and retaining walls. This exposes the structural elements that need to be waterproofed. During a previous phase (Phase 1, involving a retaining wall), existing walls were removed, a new retaining wall built, bridged over the garage, and the void between it and the garage wall was filled with 3/4 clear drainage aggregate. For the current project, the focus is on the plaza area.

Tools and materials

  • Hauling Equipment
  • Heavy Excavation Equipment
  • Waterproofing Applicators
  • 3/4 Clear Drainage Aggregate N/A

What they say

Hide

save brother and sister so this is Phase One this is the retaining wall that we drove by earlier and what happened during phase one it's the same problem that we're here for during phase two this entire wall this is the underground parking garage was leaking it was all water in fact here's a here's a glimpse inside of the garage so what we did in this case was we removed the existing walls we built this retaining wall up then we bridged it over the garage that's actually the flashing for the garage and then we built it back down we pulled it off from the garage wall and then we filled the entire void between the wall a retaining wall and the garage wall with 3/4 clear drainage aggregate so this entire Gap here we imported thousand uh hundreds of tons of drainage Aggregate and what we

Auto-generated from the video audio.