Plan Extensive Sub-base Excavation
1:40
7:58
14.8K views
At 1:40 in
How to price Landscape Design on Commercial Projects
What happens here
The core solution involves removing a significant amount of existing soil (approximately 1100 cubic yards) from the plaza surface directly above the underground parking garage. This is a major grading operation to expose the garage roof and retaining walls for waterproofing and drainage. The speaker notes the complexity of the commercial site and the need for a detailed plan.
Tools and materials
- Dump Trucks
- Excavation Equipment (e.g
- Excavator
- Skid Steer)
- Surveying Equipment
What they say
(721 characters)Hide
What they say
(721 characters)Auto-generated from the video audio.