Plan Extensive Sub-base Excavation

1:40
7:58
14.8K views

At 1:40 in

How to price Landscape Design on Commercial Projects

What happens here

The core solution involves removing a significant amount of existing soil (approximately 1100 cubic yards) from the plaza surface directly above the underground parking garage. This is a major grading operation to expose the garage roof and retaining walls for waterproofing and drainage. The speaker notes the complexity of the commercial site and the need for a detailed plan.

Tools and materials

  • Dump Trucks
  • Excavation Equipment (e.g
  • Excavator
  • Skid Steer)
  • Surveying Equipment

What they say

Hide

which is basically we've got to shave almost a thous actually it's 1,00 cubic yards of soil off from the top of a building garage so there's an underground garage so we are underneath the plaza this is the parking garage and you can see the water infiltration coming in here here and what we've got to do is we've got to take strip all this off this entire area under here above so that we can get the proper flashing in so the existing drain tile system that's in place can actually function so imagine this is your garage then they've got this layer of soil on the top and we've got to shave a portion of that off because they're getting water infiltration into it and I use the bundle and SA technique to do my pricing

Auto-generated from the video audio.