Remove Subfloor and Prepare for New Flooring
At 11:44 in
How to Make Your Small Bathroom Bigger
What happens here
The old particle board flooring, and potentially multiple layers of linoleum, are removed to expose the original wood planks underneath. The worker attempts to pry off the top layer of flooring but encounters significant flaking, indicating poor adhesion that would compromise new tile installation. A circular saw is used to cut the particle board into smaller, more manageable sections, followed by a pry bar and hammer to remove them. The narrator discovers previous plumbing lines and multiple layers of flooring, indicating past renovations. This also generates significant dust, particularly from cutting particle board. It's critical to maintain existing dust containment barriers throughout this process. Once the particle board is removed, the original subfloor is visible, which will be prepared for new flooring.
Goal: Clear the floor down to the original subfloor for new tile installation.
Tools and materials
- Circular Saw — Cutting the particle board subfloor into manageable pieces
- Hammer — Assisting with prying and breaking floorboards
- Pry Bar — Removing baseboards and prying up floor sections
- Respirator Mask 3M — Protecting against wood and particle board dust
- Safety Glasses — Eye protection from flying debris
- Work Gloves KOBALT — Protecting hands during demolition
- Plastic Sheeting — Maintaining dust barriers to contain fine wood and particle board dust
What they say
(2,138 characters)Hide
What they say
(2,138 characters)Auto-generated from the video audio.