Skip to main content

Final Drywall Removal for Pocket Door and Expansion

15:40
19:04
150.6K views

At 15:40 in

How to Make Your Small Bathroom Bigger

What happens here

The final stage of demolition involves removing remaining drywall panels and studs to create an opening for a pocket door and further expand the space. A level is used to mark cutting lines, and a reciprocating saw precisely cuts the drywall. Remaining sections of drywall are pried off, and insulation is removed. The final wood studs and headers in the designated pocket door area are dismantled to prepare for the new pocket door frame. The worker emphasizes the expanded space allows for a larger shower and vanity. Throughout these final steps of drywall removal, the constant use of a respirator indicates the ongoing presence of dust. Ensure dust barriers remain intact and consider running an air scrubber to maintain air quality during and after the demolition phase.

Goal: Complete demolition of remaining drywall and studs to install a pocket door and maximize space.

Tools and materials

  • Hammer — Assisting with prying and breaking materials
  • Level — Marking straight cutting lines for drywall and ensuring proper alignment for new framing
  • Pry Bar — Prying off drywall sections and dismantling wood studs
  • Reciprocating Saw — Cutting drywall and wood studs for removal
  • Respirator Mask 3M — Crucial for protecting against drywall dust
  • Safety Glasses — Eye protection from flying debris
  • Work Gloves KOBALT — Protecting hands during demolition
  • Air Scrubber — Filtering airborne dust particles during and after demolition to improve air quality
  • Masking Tape — Taping plastic sheeting securely
  • Plastic Sheeting — Ensuring all openings are fully sealed to contain drywall dust. Consider double-layering for optimal containment

What they say

Hide

already I'm excited for this man it was a struggle trying to get the section out and here's what I discovered there was not only one layer of uh lenium tile but there's two layers on top of it and then that also means two two layers of particle board just stacks on stacks on Stacks just why not slap it on so what we got next before this uh demo is done is I want to put a pocket door because if you think about it you have three bedrooms one bathroom it's a small house like 1500 ft this bedroom that's behind us is the largest bathroom bedroom of them all so I think to make it more accessible and more functional what we're going to do is we're going to try to put in a pocket door so it's kind of acts as a master or primary whatever you want to call it bedroom bathroom uh Slash with the door being here as well um as a bathroom for guests to use and whatnot so to do that we're going to have to rip off the rest of this drywall here and then get rid of some of these studs so we can start bring in a a pocket door and get that section all dialed [Music] n [Music] let's try this open woo I think this is the best idea I've had so far this is incredible so we got an extra added uh 20 ft to this bathroom we got a blank canvas to rearrange it any way we want which is going to be incredible because we're going to do a giant shower a giant vanity we now have an entrance to the master bedroom or the primary bedroom via the sliding pocket door uh I had to open all this up because I have to have the frame for the thing to come in so the pocket or could sit inside of it folks this has been an incredible time for me uh I didn't know what I was going to do with it but now I kind of have a Clear Vision this is going to be an awesome bathroom considering it's the only bathroom in here demo day is officially wrapped up make sure you tune in for the next video where we start handling the pocket door we start handling the vanity do something ginormous and exagger extravagant in front of this thing so thank you so much for watching and in the meantime here's a video that I think you might enjoy

Auto-generated from the video audio.