Site Preparation and Trench Excavation
0:00
7:35
99K views
At 0:00 in
How to make $1,500 in 90 Minutes Doing Sewer and Water Work
What happens here
The project begins with the arrival and positioning of heavy machinery. A New Holland B110B backhoe, equipped with an 'Extenda-hoe' attachment, and a dump truck (from Commercial Utilities Inc.) are brought to the site. The backhoe then commences the excavation of a deep trench, typically 8 to 19 feet deep, situated between the street curb and the house foundation. This step requires precise maneuvering to avoid existing underground utilities.
Goal: Safely excavate a trench to access underground utility lines.
Tools and materials
- Dump Truck GMC — Transporting excavated dirt and debris
- New Holland B110B Backhoe New Holland — Excavating the trench to access sewer and water lines
- Utility Locators/Marking Paint — Identifying and marking existing underground utility lines before digging
What they say
(263 characters)Hide
What they say
(263 characters)Auto-generated from the video audio.