Backfill Trench and Site Cleanup
3:40
7:35
99K views
At 3:40 in
How to make $1,500 in 90 Minutes Doing Sewer and Water Work
What happens here
After the utility lines are securely disconnected and capped, the trench box is carefully removed from the excavation using the backhoe. The previously excavated dirt is then backfilled into the trench, ensuring proper compaction to prevent future settling. Any excess dirt or remaining construction debris is loaded onto the dump truck and hauled away, completing the site restoration and leaving the area clean and safe.
Goal: Restore the excavation site to its original condition.
Tools and materials
- Dump Truck GMC — Transporting excess dirt and debris from the site
- New Holland B110B Backhoe New Holland — Removing the trench box and backfilling the trench
What they say