Turn On and Check for Leaks
At 12:43 in
How to install a waterfall in 2 hours & 20 minutes steps 7-14
What happens here
With all components installed and decorative elements in place, turn on the submersible pump. Observe the water flow over the waterfall and thoroughly inspect the entire feature, paying close attention to the spillway connections, liner edges, and any areas where water might be seeping. The presenter emphasizes that the most common reason for call-backs is leaks, usually caused by low edges in the liner or improper sealing. Ensure all water is contained and circulating correctly within the system.
Goal: Activate the submersible pump to start the waterfall and thoroughly inspect the entire feature for any signs of leaks, ensuring all connections and seals are watertight.
Tools and materials
- Submersible Pump Aquascape
- Water
What they say
(777 characters)Hide
What they say
(777 characters)Auto-generated from the video audio.