Spread and Level Screed Base
2:05
21:52
26.8K views
At 2:05 in
How To Install A Natural Stone Patio
What happens here
After laying the initial pavers, spread a layer of fine crushed stone (screed base) over the compacted aggregate. Place screed pipes or aluminum channels as guides. Use a shovel to distribute the screed material and then pull a leveling rake or straightedge across the pipes to create a perfectly uniform and precise depth for the paver bedding layer. Remove the screed pipes as you proceed.
Goal: Distribute and precisely level the screed base over the compacted sub-base.
Tools and materials
- Leveling Rake/Straightedge