Prepare Walkway Base for Slope
5:20
21:52
26.8K views
At 5:20 in
How To Install A Natural Stone Patio
What happens here
For a sloped walkway, establish a consistent base. Set a string line at the desired height (e.g., 6 inches above finished grade at the top). Use a custom-made screed jig (a block of wood with a handle to maintain 8 inches below the string line) to create an even, consistent slope. This ensures proper drainage and a smooth walking surface.
Goal: Ensure a consistent 8-inch slope for the walkway base using a string line and a screed jig.
Tools and materials
- Level
- Crushed Stone / Gravel Unspecified