Inspect Electrical Panel and Plan Cable Route
0:05
2:27
13.1K views
At 0:05 in
How to install a ChargePoint EV Charger in 3 Minutes!
What happens here
Begin by removing the cover of the main electrical panel. Take a careful look inside the panel to assess the existing wiring, available space, and the best course of action for routing the new electrical cable to the desired EV charger location. If the electrical panel is flush-mounted, it will be necessary to cut through the drywall to create a path for the wiring.
Goal: Determine the optimal cable routing path and assess electrical panel capacity and accessibility.
Tools and materials
- Electrical Panel — The main power distribution point where the new circuit will be added
- Screwdriver — To remove the electrical panel cover