Itemize Additional Project Components

18:20
25:10
347.8K views

At 18:20 in

How to do Retaining Wall Bids, Estimates and Proposals

What happens here

Beyond the main retaining wall and excavation, several other critical tasks require itemization. These include: removing and reassembling the neighbor's existing retaining wall (estimated at $725), which involves carefully peeling it back and stitching it to the new wall; removing and disposing of old concrete stairs ($490); hand-disassembling and saving a fence ($350); and exporting any extra fill soil at $325 per load. Each of these components, though seemingly minor, contributes significantly to the overall project cost and must be explicitly detailed to the client.

What they say

Hide

doing now as part of that program part of this job proposal we have to actually disassemble part of the neighbor's wall and we have to stitch it back together so the neighbor's Wall comes flush here's the wall we're removing here's the neighbor's wall that we had built I've got to peel this part back and then Stitch it into the existing wall so they all flow together that doesn't happen for nothing okay there's a lot of work that has to go into that and I'm line eming that I'm line eming that for $725 is what I'm line eming that for it's going to take me about a day to pull it apart and probably another day or so half a day to reassemble it and put it all together it's not a huge amount of work on its own but it's just part of the overall scope of work and something that's easy to overlook so I want to make sure that you guys are on the same page as me now because in the original proposal I had options in here optional removing stairs reassembling fence saving the fence exporting extra fill soil and the customer was okay with this format I'm kind of sticking with that for the rest of this one okay and so I have the same thing remove the stairs and dispose now this case is $490 in the original proposal from 2012 it was $390 so the extra $100 inflation everything costs me more now it's been three years so that's how I justify it hand disassemble fence and save it is a line item is $350 behind that retaining wall was a fence I really hope they don't want me to hand disassemble and save that thing because it's not going to look any better and I'll probably end up talking the customer out of it but in case they're adamant about it I'm protected I have $350 in there and then

Auto-generated from the video audio.