Final Review and Best Practices for Proposals

20:09
25:10
347.8K views

At 20:09 in

How to do Retaining Wall Bids, Estimates and Proposals

What happens here

The final step involves compiling a comprehensive proposal that protects the contractor and ensures client understanding. This includes boilerplate clauses like a 'Notice of Pre-Lien' to safeguard against non-payment, and clear inclusions/exclusions to define the scope of work. By using a standardized, itemized format, contractors can ensure all costs are covered, profits are built into every component, and clients are fully informed. This approach leads to higher success rates, increased project volume, and less conflict, allowing the business to stay busy and profitable.

What they say

Hide

protected I have $350 in there and then here's an important one here's an important line item there the last line item is export extra fill soil at $325 okay make sure you go back and pause this video in the beginning and make sure you get a good understanding that last line item protects me if our math is off if the calculation of the soil that we're going to remove between the garage and the um the bank and the retaining well that we're going to build doesn't quite work out and I end up hauling one more extra load out I'm protected here's what I'm going to get I'm going to get $325 for that extra load of dirt it says so right in the contract right on the very bottom okay now a lot of you asking well how much is the overall job value here well look at it there it is it's right there that's what this project is and in fact I want you to notice a few things not only did I line item everything that's in this job but then I go back and I repeat myself and say hey this proposal includes certain things and then I go in and say this proposal does not include I actually go through and exclude things a lot of them don't even apply towards this job but it's boilerplate boilerplate means it's on every single project that I do I cover myself because it's too too hard to try to think of every detail on every job so you create a generic list and you rubber stamp it onto every job you what else's rubber stamped that my proposals on every one of them excuse me for bumping you see this box right here see this box boom boom boom boom look at I even specifically outlined that box you know what that box is notice of prelink you have to do that in my state I don't know about your state but if I don't give them a prean notice if this gal and this guy decide they don't want to pay me I can't lean their house but because it's right on the original proposal and they will have to sign this give me $100 and send it back to me here's how my proposals look okay here's actually a few of our our here's our job list here's how we we we format it okay their $100 deposit gets stapled right to their check and this is how busy we stay because of how we operate there's no way I can get through a quarter of these jobs this year I'm already booking for next year because every proposal is the same guys and gals out there it's clear it's easy for the customer to understand I break it down light item per line item it's tougher for me to do that you know I'd rather be doing right now than putting…

Auto-generated from the video audio.