Skip to main content

Dig Holes for Concrete Footings

10:09
34:54
220.6K views

At 10:09 in

How to Build a Simple Deck

What happens here

Using a Ryobi 40V battery-powered auger, holes are drilled into the marked footing locations. These holes must extend below the frost line to prevent the footings from heaving due to freeze-thaw cycles, ensuring long-term stability for the deck. The auger makes the process quick and efficient, though encountering tree roots can slow progress.

Goal: Post holes for the concrete footings are dug below the frost line using a Ryobi 40V battery-powered auger, ensuring stability against ground movement.

Tools and materials

  • Ryobi 40V Auger Ryobi

What they say

Hide

will be enough of a step forward just my luck I'm hitting a tree stump I got a bunch of roots coming through here so I'm sure it's just a rout there now we're cooking oh we're cooking now if I can give you one piece of wisdom whether it's this spring this summer this fall and you're going to be do some yard work and you need to put some fence up post up maybe plant some trees get yourself an auger I swear even though I had some problems on the first hole cuz of the roots all three holes got done in what 8 minutes this is awesome this is awesome oh this is

Auto-generated from the video audio.