Identify Projects for Time and Material Bids
0:28
10:48
123.5K views
At 0:28 in
How to Bid Landscaping
What happens here
The speaker then presents a residential property completely overgrown with thick vegetation, resembling a 'jungle.' He uses this as a prime example of a project where a lump-sum quote would be too risky and advises against it. The sheer density of the overgrowth prevents any clear assessment of what lies beneath, such as potential debris, buried structures, or hazardous materials. In such cases, the unpredictability of the required labor and potential material removal costs makes a time and material quote the safer option for the contractor.
Goal: Recognize project types with high unpredictability that necessitate time and material bidding.