Pile Management and Path Creation
3:01
21:33
236.1K views
At 3:01 in
How NOT to run a skid steer
What happens here
The instructor outlines a strategy for approaching existing piles of dirt when the site is cluttered. He suggests two options: either pushing the current pile with a bucket load to create a path, or moving around the piles by taking small scoops ('hopscotch') to gradually clear a path. The main goal is to create an even path for further work, which prevents gouging and allows for smooth travel. This strategy also applies to delivering new material by creating a clear path to and from the delivery point.
Goal: Effectively manage existing dirt piles to create clear and even paths.
Tools and materials
- Dirt Piles N/A — Obstacles and material to be moved on the job site
- Skid Steer Loader ASV RT-75 Posi-Track — The primary piece of heavy equipment being operated