Proper Base Preparation

0:28
15:35
111.8K views

At 0:28 in

How NOT to pour a concrete slab, sidewalk or driveway. Beginner mistakes & Red flags! 4k video

What happens here

Ron emphasizes that what lies beneath the concrete significantly impacts its long-term performance. He instructs to always remove all organic materials, including topsoil and vegetation, from the excavated area. For a residential light traffic load like a sidewalk, about 4 inches of Class 5 base material over raw, non-organic soil is recommended. For heavier traffic loads such as a driveway, the base material depth should be increased to 6, 8, or even 12 inches, especially for areas with heavy vehicle traffic like semi-trucks.

Goal: Prepare a stable, non-organic base for the concrete.

Tools and materials

  • Shovel — Excavating soil
  • Soil removal equipment — Hauling away excavated organic materials
  • Class 5 Base Material — Creating a stable, compacted sub-base for the concrete

What they say

Hide

you've been down this road far too long he left you're a little behind but still what are the beginner mistakes the things these guys should they think they should do you see guys doing but they're actually the wrong thing to show that you [Music] it's like dying bomb you only get so much time to pour it finish itself