What happens here
Ron emphasizes that what lies beneath the concrete significantly impacts its long-term performance. He instructs to always remove all organic materials, including topsoil and vegetation, from the excavated area. For a residential light traffic load like a sidewalk, about 4 inches of Class 5 base material over raw, non-organic soil is recommended. For heavier traffic loads such as a driveway, the base material depth should be increased to 6, 8, or even 12 inches, especially for areas with heavy vehicle traffic like semi-trucks.
Goal: Prepare a stable, non-organic base for the concrete.
Tools and materials
- Shovel — Excavating soil
- Soil removal equipment — Hauling away excavated organic materials
- Class 5 Base Material — Creating a stable, compacted sub-base for the concrete
What they say
(319 characters)Hide
What they say
(319 characters)Auto-generated from the video audio.