Concrete Slump and Pouring Sequence

1:30
15:35
111.8K views

At 1:30 in

How NOT to pour a concrete slab, sidewalk or driveway. Beginner mistakes & Red flags! 4k video

What happens here

The consistency of the concrete (slump) is important. A typical 4-5 slump is used for sidewalks, while a slightly stiffer 3-4 slump is preferred for steps. If both steps and an apron are being poured on the same day, Ron advises pouring the steps first. This is because the stiffer concrete needed for steps might become too hard if left in the truck, whereas excess water can be added to the remaining concrete for the apron if necessary to achieve a higher slump. However, adding water to the concrete mix after it has left the plant is generally not recommended as it reduces the concrete's strength.

Goal: Select the correct concrete slump and pour in the optimal order.

Tools and materials

  • Concrete Truck Cemstone — Delivering concrete with specific slump requirements
  • Concrete Retarder — Extending the working time of concrete in warm conditions

What they say

Hide

buddy Ron Graf from concrete arts we work together for how many how many years now Ron that's probably 20 years dammit that makes us old all right so you've got the everything excavated out the soil you're gonna be hauling away no organic material goes beneath any concrete ever right I mean that's my rule of thumb I mean it's what's underneath it besides what you put over