Before any concrete is poured, the subgrade must be meticulously prepared. This involves excavating all organic material, such as topsoil and vegetation, as these materials can decompose over time, leading to settlement and cracking of the concrete. Once excavated, a compactable, non-organic base material, such as Class 5 gravel (a mix of 3/4-inch material and fines) or recycled asphalt/concrete, is laid down. For residential light traffic, a 4-inch base is recommended. For driveways or areas with heavier traffic, the base depth should be increased to 6 inches, or even 8 to 12 inches for extreme heavy loads like loading docks. This base material must be thoroughly compacted to provide a stable foundation, preventing future settlement and ensuring the longevity of the concrete pavement.
Goal: Proper subgrade preparation involves excavating organic material and laying down a compactable, non-organic base layer to ensure long-term concrete performance.
Tools and materials
- Compactor (Plate Compactor
- Jumping Jack)
- Excavation Equipment (Shovel
- Mini-Excavator)
What they say
(1,857 characters)Hide
What they say
(1,857 characters)Auto-generated from the video audio.