What happens here

Before any concrete is poured, the subgrade must be meticulously prepared. This involves excavating all organic material, such as topsoil and vegetation, as these materials can decompose over time, leading to settlement and cracking of the concrete. Once excavated, a compactable, non-organic base material, such as Class 5 gravel (a mix of 3/4-inch material and fines) or recycled asphalt/concrete, is laid down. For residential light traffic, a 4-inch base is recommended. For driveways or areas with heavier traffic, the base depth should be increased to 6 inches, or even 8 to 12 inches for extreme heavy loads like loading docks. This base material must be thoroughly compacted to provide a stable foundation, preventing future settlement and ensuring the longevity of the concrete pavement.

Goal: Proper subgrade preparation involves excavating organic material and laying down a compactable, non-organic base layer to ensure long-term concrete performance.

Tools and materials

  • Compactor (Plate Compactor
  • Jumping Jack)
  • Excavation Equipment (Shovel
  • Mini-Excavator)

What they say

Hide

your tears they say a thousand [Music] all right so we got a lot going on in this jobsite we're pouring a new apron and a new set of concrete stairs right Ron all right all right guys this is my buddy Ron Graf from concrete arts we work together for how many how many years now Ron that's probably 20 years dammit that makes us old all right so you've got the everything excavated out the soil you're gonna be hauling away no organic material goes beneath any concrete ever right I mean that's my rule of thumb I mean it's what's underneath it besides what you put over it so but we get rid of all the vegetation and the grass yeah topsoil basically yeah so I'm gonna jump in here because what you do beneath the concrete is gonna have a major impact on how well your concrete performs long term you don't want to put your concrete on organic materials in any way shape or form you want to have some base preparation made and what we're looking at here is this is what's called a class-five base this makes great material but let's talk about the depth that you need so if you're gonna have just a residential light traffic load you're gonna want about four inches of base material over your raw soil again non-organic material but still Ross oil 4 inches of class 557 stone anything that will be compactable is excellent material for beneath the sidewalk now if you have a heavier traffic load and you're gonna be bumping up maybe going into a driveway area you can stick with the 4 inches but then I'd recommend maybe going up to 6 inches for a typical driveway like you see behind me now in extreme cases where semis and you're gonna have a heavy traffic load then you're gonna bump that up to 6 8 even 12 inches if you're in loading docks or loading ramps or things like that the base will impact how well your concrete performs long-term yep now you've

Auto-generated from the video audio.