Skip to main content

Base Layer Installation

9:35
18:06
5.3K views

At 9:35 in

How NOT to build a Patio!

What happens here

Workers use a skid steer to efficiently spread the recycled Class 5 material across the prepared area. They then meticulously use large straight edges, guided by the pre-laid steel screed pipes, to achieve the exact desired 1-inch drop per 8 feet of run. This ensures the patio will have the correct drainage and will not be perfectly flat. Once the Class 5 material is spread and leveled to the correct height and pitch, a plate compactor is used to firmly compact the entire sub-base, creating a dense and stable foundation for the paver tiles.

Goal: Create a compacted and precisely sloped sub-base.

Tools and materials

  • Large Straight Edge — Leveling base material, Plate Compactor Unknown
  • Recycled Class 5 Material — The sub-base of the patio