Skip to main content

Initial Grading and Site Leveling

0:04
15:58
48.8K views

At 0:04 in

How does the City get away with this?

What happens here

An orange Kubota SVL 75-2 compact track loader, operated by Zakk, is used to push and spread the mounds of dirt. The machine's bucket efficiently moves the material, beginning the process of shaping the landscape. This rough grading establishes the general contours of the future drainage slope and prepares specific areas for the retaining wall, including leveling a muddy section.

Goal: Utilize a compact track loader to roughly spread the delivered fill dirt and establish the initial grades across the work area. This step includes moving soil, pushing it into position, and leveling sections of the ground to prepare for subsequent construction.

Tools and materials

  • Bucket Attachment