Exploiting Change Orders

3:45
10:35
54.3K views

At 3:45 in

How Contractors screw sub contractors pt1

What happens here

The presenter continues to discuss the strategic use of change orders in the construction industry. He explains that some contractors intentionally bid projects 'super low' to win the contract, knowing that almost every project will inevitably involve change orders. This strategy allows them to then 'make their money' by significantly increasing prices for these change orders, effectively 'gouging' the client or subcontractor. He uses the example of his retaining wall project, which started as a 50-foot wall but grew to over 400 feet due to change orders, ballooning the cost from an initial estimate of $10,000 to $40,000. This increase was driven by a single suggestion to tie the new wall sections back into the original design, requiring precise laser-grading for every block.

Goal: Illustrate how bidding low and then utilizing change orders can be a business model for some contractors.

Tools and materials

  • Laser Grader
  • Retaining Wall Blocks

What they say

Hide

and you don't have the swagger power to knock back you might be risking too much that's a beautiful question so remember it goes back to who has the strength who's in the position of power right me as the subcontractor already started in working on a project with the contract in place has the position of power to negotiate because if I fulfill my contractual obligation I'm then done if they want extra work that doesn't necessarily mean I have to do it change orders are where some contractors make their money I've learned this through the whole process of compounding where guys will come in and bid a job solo it doesn't make sense as a competitor to go how do they do that and then you learn that their whole business model is based on change orders because almost every product has a change order yeah right and when a change order comes you then don't just raise your price you jump and I'm not that way so that's not in my DNA but that's how some guys all they do here's the thing with this jobsite this was a really simple project that turned very complicated by one little suggestion so let me just paint you the picture of what happened if you can see this retaining loss not a massive retaining wall and this retaining wall was supposed to start right about over there somewhere an end right about where we're at and that was it this was just going to be a nice little quick slam dunk get in get out down the road we built it and then the project supervisor that was overseeing the entire construction of the facility said hey we want to add on to the wall and I'm like hey I want more money let's agree to do this and so what you're gonna see is he added on to this wall all the way around the wall went from being 50 feet long to being over 400 feet long where it became a problem was the then asked me to tie them back together so we start at Point a and we bring the wall 400 feet out in a giant circle and loop it back in itself means that every single one of these blocks as we're basing it has to be laser graded we can't be off because what'll happen a lot of times when you're constructing a normal retaining wall and it's not unusual for it to climb or to dip a little bit and it's almost imperceptible except when it's got to touch back in and be very precise so we went ahead and did the work we wrapped it all the way around tied it into itself everything worked out great I rolled up the invoice it went from being like I don't know it's like it virtually ten thousand…

Auto-generated from the video audio.