Skip to main content

Integrate Utility Allowances into Framing

0:20
0:29
2.5K views

At 0:20 in

holds it all in. #swimmingpool #hardscape

What happens here

As the concrete forms are being built, it is essential to identify and plan around any existing or future utility installations. The video specifically highlights a gas line stubbed up from the ground, which is intended for a linear fire pit. Ensure that the formwork is designed to accommodate these utilities, leaving appropriate clearances and access points. The gas line, or any other utility line, should be adequately protected from direct contact with wet concrete and positioned so it remains accessible for subsequent installation or maintenance of the associated feature.

Goal: Ensure that the concrete forms properly accommodate and protect existing or planned utility lines.

Tools and materials

  • Gas Line — Future connection for a linear fire pit
  • Protective Casing — Protecting utility lines from concrete and allowing for future access