Initial Backfilling of the Pool
6:49
14:02
72.8K views
At 6:49 in
Heavy Demolition in 4 k!
What happens here
After the pool structure is sufficiently broken down, the excavator begins pushing clean dirt (fill material) into the excavated pool basin. This initial backfill serves to stabilize the area and prepare it for further compaction and final grading.
Goal: Start filling the pool excavation with clean dirt
Tools and materials
- Kobelco Excavator Kobelco — Pushing and distributing fill material
- Clean Dirt — Filling the excavated pool basin
What they say
(136 characters)Hide
What they say
(136 characters)Auto-generated from the video audio.