Skip to main content

Initial Power Raking for Driveway Base

8:28
24:52
188.4K views

At 8:28 in

Grading a gravel Driveway to a "Glass" finish

What happens here

Begin the initial grading passes using the power rake attached to the yellow skid steer. The primary focus here is to carefully use the front wheels of the power rake to lift the tines as needed, preventing them from digging too deep into the existing driveway material. This technique is crucial to avoid mixing the new blue aggregate with the underlying brown subsoil, ensuring distinct layers and a clean finish.

Goal: Start grading the driveway by blending new aggregate without mixing it with the subsoil.

Tools and materials

  • Power Rake — Blending and leveling the driveway aggregate, Yellow Skid Steer Unknown

What they say

Hide

confidence right [Music] uh [Applause] [Music] [Applause] [Music] gracie and i are drinking aha black cherry and coffee likey [Music] so one thing that i'm doing different with this is i don't want to mix the layers of aggregate on the driveway so i'm actually being really careful to just blend my surface mix because if i mix them up see it's got a brown layer underneath and i want this driveway to be as blue as the sky when i'm done

Auto-generated from the video audio.