Backfilling and Final Grading
15:43
18:41
83.6K views
At 15:43 in
Full day of work excavating & Landscaping a backyard with new retaining walls 4k Timelapse
What happens here
After the retaining wall is fully constructed, the area behind it is backfilled with soil and graded to match the surrounding landscape. The ASV RT-75 skid steer can be used to move and distribute large volumes of backfill, while manual labor with shovels and rakes helps to refine the grade and ensure proper drainage away from the house. The goal is to create a smooth, aesthetically pleasing transition from the new retaining wall to the existing terrain.
Goal: Complete backfilling and finalize grading around the retaining wall.
Tools and materials
- ASV RT-75 Skid Steer ASV — Moving and spreading large quantities of backfill soil
- Rakes — Smoothing the final grade
- Shovels — Refining grading and manual backfilling
- Backfill Soil — Filling behind the retaining wall and grading the surrounding area
What they say
(471 characters)Hide
What they say
(471 characters)Auto-generated from the video audio.