Skip to main content

Site Preparation and Rough Grading

9:05
58:22
36.1K views

At 9:05 in

FULL Backyard MAKEOVER - Start To FINISH!

What happens here

Utilize a mini-skid steer (such as a Toro Dingo TX-1000) with a bucket attachment to perform rough grading and initial excavation of the patio area. This involves removing existing topsoil and leveling the ground to prepare for the base layers. The video shows the machine moving earth to create the desired elevation and shape for the multi-tiered patio.

Tools and materials

  • Bucket Attachment
  • Mini-Skid Steer (Toro Dingo TX-1000)