Assembling Trencher and Reviewing Gas Pipe
At 6:45 in
Franky almost killed me trenching an underground line.
What happens here
The trencher attachment is connected to the mini loader using its quick-attach mechanism. The hydraulic hoses are then attached, and the system is tested to ensure proper function. The creator also showcases the gas line itself: a yellow Pro-Poly Direct Burial Gas Piping System, which comes in a 300-foot coil. He then shows the specialized plumbing-style connectors that are certified for underground use, which will be used to connect sections of the pipe if needed. He reiterates the importance of burying the pipe deep enough to avoid damage, preferably 2.5 to 3 feet deep to prevent disturbance from frost or future digging.
Goal: Prepare the trencher and understand the gas piping system
Tools and materials
- Hydraulic Hoses — Connecting the trencher to the mini loader's hydraulic system
- Mini Loader CastLoaders Carbon 33T — Operating the trencher and moving dirt
- Trencher Attachment — Digging the trench
- Specialized Gas Line Connectors — Joining sections of the gas pipe
What they say
(872 characters)Hide
What they say
(872 characters)Auto-generated from the video audio.