Skip to main content

Demolish Archway

13:05
18:06
306.6K views

At 13:05 in

Floor Demo + OUR FOUNDATION IS CRACKED! || Concrete Slab House (Ep.2)

What happens here

The team proceeds to remove a decorative archway, part of a pillar structure, that obstructs the desired open-concept layout. Before demolition, they confirm the structure is non-load-bearing by drilling into it and noting its hollow nature. A reciprocating saw is then used to make precise cuts through the archway's components. Following the cuts, physical force (hammering, kicking) is applied to remove the remaining sections, creating an unobstructed passage and updating the home's aesthetic.

Goal: Demolish a non-load-bearing decorative archway using a reciprocating saw and physical force after confirming its non-structural status.

Tools and materials

  • Dust Mask/Respirator
  • Hammer
  • Ladder
  • Safety Glasses
  • Work Gloves

What they say

Hide

cool cool cool now you might be wondering what i'm doing on a ladder well part of the flooring demo day obviously we need to put flooring on the ground well these ugly posts are in the way and we need to open it up i am willing to put money with tyler that uh this is not a load-bearing post but to be safe i'm gonna put a hole in here do a little examining a little surgery be sure and then we'll knock this puppy down so we can floor all the way through we got our hand in there we're actually able to even put our hand in through here so it's a hollow cavity as silly as it sounds they just basically put posts up like pillars anywho i'm just glad it's not load bearing so we're gonna take our recipe saw cut it down and just another safety mechanism if you want like double sure that it's not load bearing if you start cutting your recip saw here and the blade gets pinched down there's weight up there but i don't think that's the case [Music] let me break off this last piece

Auto-generated from the video audio.