Site Preparation and Base Layer Installation
At 0:30 in
Finish=Turning a Hill into a flat(er) backyard 4k
What happens here
The project begins by preparing the site and establishing a stable foundation for the retaining wall. A skid steer, specifically a Caterpillar 259D, is used to move large quantities of excavated soil, creating an initial level area. This area is then compacted using a vibratory plate compactor, powered by a Honda GX160 engine, to ensure a firm and stable subgrade. The first course of retaining wall blocks is then carefully laid out and leveled, forming the base of the wall. A Makita leaf blower is used throughout this process to clear any debris from the blocks and the ground, ensuring clean contact surfaces.
Goal: Establish a stable and level foundation for the retaining wall.
Tools and materials
- Leaf Blower Makita — Clearing debris from blocks and surfaces for clean contact
- Level — Ensuring the base course is perfectly level
- Retaining Wall Blocks — Constructing the retaining wall's base course
- Shovel — Minor adjustments and leveling of soil
- Skid Steer Caterpillar 259D — Moving excavated soil and creating initial level areas
- Vibratory Plate Compactor Honda GX160 — Compacting the subgrade to ensure a firm and stable base