Constructing Retaining Wall Courses
At 1:15 in
Finish=Turning a Hill into a flat(er) backyard 4k
What happens here
This step involves building the main structure of the retaining wall by stacking multiple courses of blocks. Workers carefully lay each retaining wall block, using a large rubber mallet, commonly referred to as a sledgehammer, to firmly tap them into their final position. To maintain precise horizontal alignment and prevent deviations in the wall, a string line is meticulously set and followed along each course. Additionally, before placing each new layer of blocks, the previous course is cleaned with a Makita leaf blower to remove any dirt or debris, which helps ensure proper seating and structural integrity.
Goal: Stack and align multiple courses of retaining wall blocks to desired height.
Tools and materials
- Large Rubber Mallet — Firmly tapping blocks into place for proper seating
- Leaf Blower Makita — Cleaning debris from each course before stacking the next
- Line Level — Verifying the level of the string line
- Retaining Wall Blocks — Forming the body of the retaining wall
- String Line — Ensuring horizontal alignment of each course
What they say
(290 characters)Hide
What they say
(290 characters)Auto-generated from the video audio.