Skip to main content

Constructing Retaining Wall Courses

1:15
16:07
206.4K views

At 1:15 in

Finish=Turning a Hill into a flat(er) backyard 4k

What happens here

This step involves building the main structure of the retaining wall by stacking multiple courses of blocks. Workers carefully lay each retaining wall block, using a large rubber mallet, commonly referred to as a sledgehammer, to firmly tap them into their final position. To maintain precise horizontal alignment and prevent deviations in the wall, a string line is meticulously set and followed along each course. Additionally, before placing each new layer of blocks, the previous course is cleaned with a Makita leaf blower to remove any dirt or debris, which helps ensure proper seating and structural integrity.

Goal: Stack and align multiple courses of retaining wall blocks to desired height.

Tools and materials

  • Large Rubber Mallet — Firmly tapping blocks into place for proper seating
  • Leaf Blower Makita — Cleaning debris from each course before stacking the next
  • Line Level — Verifying the level of the string line
  • Retaining Wall Blocks — Forming the body of the retaining wall
  • String Line — Ensuring horizontal alignment of each course

What they say

Hide

down on top of it he slags off the block to knock off any rough edges to make sure that every course lays flat true and even with the course below every course gets cleaned and also every course gets string lined that way if an individual block gets off it doesn't throw the entire wall off

Auto-generated from the video audio.