Laying Subsequent Retaining Wall Courses

1:01
16:07
206.4K views

At 1:01 in

Finish=Turning a Hill into a flat(er) backyard 4k

What happens here

After the base course is set, continue laying additional courses of retaining wall blocks. Each block typically features an interlocking mechanism (e.g., a lip or pin system) to secure it to the course below. For optimal stability and to maintain a straight, level wall, use a string line stretched along the entire length of each course as a guide. Clean any debris from the top of the previous course with a leaf blower before placing new blocks. Each block is tapped with a sledgehammer to ensure proper seating. The hollow cores or specific designs of these interlocking blocks facilitate vertical drainage within the wall structure, allowing water to permeate through the wall and into the gravel backfill (which will be added later), preventing hydrostatic pressure buildup.

Goal: Build up the retaining wall by laying subsequent courses of interlocking blocks, ensuring each layer is level and aligned using a string line. This process establishes the main structure of the wall, with the blocks themselves often featuring internal drainage channels.

Tools and materials

  • Leaf Blower
  • Level
  • Retaining Wall Blocks
  • Sledgehammer
  • String Line and Stakes

What they say

Hide

crevices before the first course goes down on top of it he slags off the block to knock off any rough edges to make sure that every course lays flat true and even with the course below every course gets cleaned and also every course gets string lined that way if an individual block gets off it doesn't throw the entire wall off

Auto-generated from the video audio.