Laying Subsequent Retaining Wall Courses
At 1:01 in
Finish=Turning a Hill into a flat(er) backyard 4k
What happens here
After the base course is set, continue laying additional courses of retaining wall blocks. Each block typically features an interlocking mechanism (e.g., a lip or pin system) to secure it to the course below. For optimal stability and to maintain a straight, level wall, use a string line stretched along the entire length of each course as a guide. Clean any debris from the top of the previous course with a leaf blower before placing new blocks. Each block is tapped with a sledgehammer to ensure proper seating. The hollow cores or specific designs of these interlocking blocks facilitate vertical drainage within the wall structure, allowing water to permeate through the wall and into the gravel backfill (which will be added later), preventing hydrostatic pressure buildup.
Goal: Build up the retaining wall by laying subsequent courses of interlocking blocks, ensuring each layer is level and aligned using a string line. This process establishes the main structure of the wall, with the blocks themselves often featuring internal drainage channels.
Tools and materials
- Leaf Blower
- Level
- Retaining Wall Blocks
- Sledgehammer
- String Line and Stakes
What they say
(328 characters)Hide
What they say
(328 characters)Auto-generated from the video audio.