Skip to main content

Installing Final Courses and Capstones

5:08
16:07
206.4K views

At 5:08 in

Finish=Turning a Hill into a flat(er) backyard 4k

What happens here

Once all standard courses are laid, install the final layer of blocks, followed by the capstones. Capstones provide a flat, finished top surface for the retaining wall. Ensure capstones are cut precisely, especially where they meet existing structures or form corners. Apply a generous amount of construction adhesive (e.g., Liquid Nails or specialized landscape block adhesive) to the top of the final course of blocks before setting the capstones. This permanently bonds the capstones, preventing displacement and further sealing the top of the wall, which helps protect the internal drainage system from debris. Use pins or specialized anchoring systems where required by the block manufacturer to further secure courses.

Goal: Complete the retaining wall by laying the top-most course of blocks and securing the capstones. Capstones are glued in place to provide a finished look and protect the wall's internal drainage system.

Tools and materials

  • Capstones
  • Caulk Gun
  • Concrete Saw
  • Sledgehammer
  • Construction Adhesive
  • Retaining Wall Pins

What they say

Hide

shorts on end ones are split so we have the rough face facing outwards so you don't see a flat face we're splitting the last of the top caps too so you have the nice rough face so next step i'm going to lay out all these caps figure out what cut i need for this one glue them down and then just get that all taken care of and backfill it and we will be done [Music] take me on down [Music] all right so we gotta do a cut to finish this one so what we do for these is measure so we got six inches from the back so you measure six inches from the side that you're going to cut there and then [Music] you just put the square on there draw a straight line it should drop right in [Music] down [Applause] [Music] oh like a glove look at that all right all right the wall is done we glued the last cap right before it started to rain so that was pretty lucky i'm usually not that lucky so yeah the wall is done but

Auto-generated from the video audio.