Excavation and First Course Block Laying
0:58
13:41
118.2K views
At 0:58 in
FINISHING the Raised Paver deck & curved staircase- "the Scooby Project" pt2
What happens here
Begin by excavating the patio area to the required depth, ensuring a stable foundation. Lay down a layer of geogrid, a polymer material used to stabilize soil and prevent settling, across the entire excavated area. Next, start placing the first course of retaining wall blocks along the perimeter of the patio area, forming the initial shape of the raised structure and semi-circular steps. Ensure the blocks are level and properly aligned.
Goal: Establish the base and initial structure of the patio
Tools and materials
- Level — Ensuring blocks are level
- Shovels — Fine-tuning excavation and spreading materials
- Skid Steer ASV — Excavating the ground and moving heavy materials
- Trowel — Spreading adhesive
- Geogrid — Stabilizing the base and preventing settling
- Retaining Wall Blocks — Forming the perimeter and base of the steps