What happens here
Once the sod pallets are strategically placed, the crew begins the process of laying the sod. This involves unrolling each piece of sod onto the prepared soil. The sod rolls are laid in a staggered pattern, similar to brickwork, to prevent long, continuous seams that could be prone to separation or erosion. After a roll is placed, the crew member (Sam) uses his feet to gently kick or stomp the sod into place, ensuring good contact between the sod's root base and the prepared soil beneath. This action helps to remove any air pockets and promotes quicker rooting. The sod is typically placed as tightly as possible to minimize gaps between rolls.
Goal: Efficiently and correctly lay sod rolls to cover the desired area.
Tools and materials
- Sod Rolls Unspecified — Covering the prepared ground to establish a new lawn