Final Review of Rebuilt Dock
At 12:35 in
FAST 3 hour dock rebuild
What happens here
The presenter provides a final walk-through of the newly rebuilt dock. He points out the beveled front edge (toe kick) on the ramp section, which is screwed in permanently to prevent boards from sliding off. The rest of the main dock boards are laid in loose for easy removal. He also highlights the beveled end board and the permanently screwed-in corner piece. The rebuilt bench, now with three boards for added comfort and no armrests, is also featured. The total project time was approximately three hours, from 9:30 AM to 12:30 PM. The benefits of the composite material, such as no splinters and its 'cool touch' technology (stays cooler than wood), are reiterated.
Goal: The completed dock is showcased, emphasizing the new composite decking, the beveled edges on the ramp and corner, and the rebuilt bench, all completed in approximately three hours.