Excavate and Grade the Site

0:08
0:19
1.5K views

At 0:08 in

FAR better. #paverpatio #swimmingpool

What happens here

After demolition, excavate the area to the proper depth, typically 7-10 inches below the final paver height, depending on your climate and base material recommendations. Ensure the subgrade slopes away from the pool at a minimum grade of 1/4 inch per foot for effective drainage. Use a shovel to remove excess soil and a rake to level the surface. String lines and a level are crucial for establishing and verifying the correct pitch and elevation. Compact the subgrade thoroughly with a plate compactor.

Goal: Prepare a stable and properly graded subgrade for the paver base

Tools and materials

  • Level Stabila — Verifying slopes and flatness
  • Plate Compactor Wacker Neuson — Compacting the subgrade and base layers
  • Rake True Temper — Leveling and smoothing the subgrade
  • Shovel Fiskars — Excavating and moving soil
  • String Line and Stakes Kraft Tool — Establishing and checking grade and layout
  • Tape Measure Milwaukee — Measuring depths and distances