Skip to main content

Excavating the First Test Pit (Inexperienced Operator)

1:39
15:50
50.6K views

At 1:39 in

FAIL running the Tractor Loader backhoe 4 k video . part 2

What happens here

The soil engineer monitors Alex's initial attempts at digging the test pit. The primary goal is not just to dig a hole, but to excavate with precision to expose distinct layers of soil (stratification) without mixing them excessively. This allows the engineer to accurately assess the soil's composition and suitability for construction. Alex receives verbal cues from the instructor regarding his technique, such as 'smaller bites' to encourage more controlled movements. The backhoe's loose boom pins add an extra layer of difficulty, making precise movements trickier and adding a 'wobble' to the boom.

Goal: Alex, the new operator, attempts to excavate the first test pit under the observation of a soil engineer, focusing on controlled and precise digging for soil stratification analysis.

Tools and materials

  • John Deere 310E Backhoe

What they say

Hide

that because the soil engineer is working in a way that I'm completely not totally comfortable with so we've got at this development that's going in and soil borings need to be done but there is an inaugural available so to do the soil test on the site to see if these sites are buildable the soil engineer asked us to come out and dig test pits now I have done this before but you've got to really know what you're doing as a soil engineer to be able to accurately determine if a lot is buildable using a test pit so this test is a test to see if alex has the skill we can get past the soil engineer for soil engineer figures out whether he's done this before or not and it's also the test to see if this soil engineer doesn't catch that alex is a green operator then I know that this soil engineer is probably a green soil engineer so this is to test both weights do you want smaller bites so when we dig a test pit to determine if the lot is buildable we've got to be careful that we don't just go gouge into the dirt and move mass quantities of dirt I want the engineer to be able to see the stratification in the soil because that's going to help him determine if the Lots buildable or not now I'm gonna be guessing Alex is sweating bullets right about now because this is actually his first time ever digging with a backup [Music] now you see that wobble right there in the boob that means our pins are loose and that actually adds a little extra layer of challenge to it making precise excavation even a little bit trickier so you can't hear it in the video but Brian the soil engineers already caught on that alex is a green operator [Music] so it's actually kind of keeping track and it was two scoops in Brian figured it out and by now it's starting to test his patience I know the thumbnail of this video says failed but what's happening with Alex is not the fail part this is part of the learning process skip to above the 14-minute part to see an epic fail and that one is actually on me and what you're seeing right now is what every good backhoe operator started out there is not a single operator that's read any piece of equipment that wasn't at this initial awkward stage so there's absolutely nothing wrong with this but with so many eyeballs on them I wanted to take the pressure off from them so I'm gonna hop into the cap with

Auto-generated from the video audio.