Backfilling Test Pits and Safety Considerations

12:19
15:50
50.6K views

At 12:19 in

FAIL running the Tractor Loader backhoe 4 k video . part 2

What happens here

The backhoe operator uses the front loader bucket to push the excavated soil back into the test pits. This process involves careful maneuvering to fill the holes. The instructor stresses that these backfilled pits consist of uncompacted fill soil and would need to be re-excavated and properly compacted before any actual construction. More importantly, he highlights the critical safety concern of leaving open test pits overnight, which poses a serious hazard to children or anyone else trespassing on the site. Securing the site by filling the pits immediately is a top priority to prevent injuries. The John Deere 310E, being a two-wheel drive model, is noted for its difficulty in off-road dirt work, performing better in snowplowing applications.

Goal: The operator backfills the excavated test pits and emphasizes the critical importance of safety by ensuring all pits are closed nightly to prevent accidents, especially involving children.

Tools and materials

  • John Deere 310E Backhoe

What they say

Hide

personally like working with the common sense engineers the guys that you can relate with talk with and get a good game plan together but are still held accountable for what they say so we're gonna backfill this one and then go dig a second test pit to make sure that the entire site is okay but one of the questions that get asked a lot is this John here is a too 99% for snow blowing I don't do use it for dirt work and this is why they do it does not do good offroad much better in the winter and summer [Applause] [Music] so now here's something that's pretty easy to forget this test pit will have to be re excavated before a house can be built on it because this is uncompacted fill soil if we just put a footing over the top of this it could lead to failure down the road so whoever does the excavation whether it's us or somebody else they'll need to pull the material out of this test foot and then put it back in place and compact it the reason we're not doing that right now is because I need to secure the site I want to make sure that we don't have any test pits left open overnight in case any kids in the neighborhood come traipsing through the lot they could fall into it and get hurt so their safety is my number one priority before construction begins though this test fit we'll need to be fixed the right way [Applause] but it'd be closing this video out here guys I just want to let you know that we had multiple test pits to dig on this site and you see Brian the the soil engineer standing right alongside of my boom as I'm digging I want to point out