Set Up Sawmill for Operation

22:50
52:11
22.7K views

At 22:50 in

Everything just BROKE AGAIN! Was it MY FAULT?

What happens here

After all repairs are complete and the lubrication system is functional, prepare the sawmill for operation. Begin by lowering the trailer jack and using the provided metal rod to manually jack down the six leveling points along the sawmill bed. The goal is to ensure the sawmill bed is as level as possible, which is crucial for cutting straight lumber. Once the sawmill is level and stable, it is ready for milling.

Goal: Prepare the sawmill for immediate use.

Tools and materials

  • Metal Rod — Manually adjusting the leveling jacks