Set and Precisely Level the First Course of Blocks
At 8:17 in
Double Terraced wall Crashes down pt1
What happens here
Using a skid steer loader, transport pallets of retaining wall blocks to the work area. Carefully unload the blocks onto the prepared base at the starting point of the wall, typically in a corner next to a fixed structure like the garage. Begin laying the first course of blocks, meticulously leveling each block front-to-back and side-to-side using a level and making minor adjustments with a dead blow hammer. Each block must also be leveled with the adjacent blocks. This precise process is vital as the first course dictates the alignment and stability of the entire wall. In difficult corners, each block is checked for level in multiple directions and relative to its neighbors.
Goal: Install the first course of retaining wall blocks with extreme precision to establish the wall's foundation.
Tools and materials
- Dead Blow Hammer — Making minor adjustments to block placement without damaging them
- Level — Ensuring blocks are perfectly level front-to-back and side-to-side
- Retaining Wall Blocks — Constructing the wall
- Rubber Mallet — Gentle tapping for minor adjustments
- Skid Steer Loader Caterpillar — Transporting pallets of retaining wall blocks