Fine-Tune Base Height and Re-Compact
6:17
15:59
76.2K views
At 6:17 in
Double Terraced wall Crashes down pt1
What happens here
After initial compaction, a mini excavator is used to remove a small amount of excess base material that was unintentionally overfilled. This is crucial to achieve the correct final height for the first course of blocks. The remaining base material is then re-compacted with a plate compactor and precisely leveled using shovels, a broom, and a string line as a guide. Blaine ('The Mathman') uses a tape measure and precise calculations to ensure the base is at the exact elevation for the first course of blocks.
Goal: Achieve the exact height and levelness for the first course of retaining wall blocks.
Tools and materials
- Broom — Sweeping away loose stone for a fine finish
- Line Level — Ensuring the string line is perfectly level
- Mini Excavator Bobcat — Removing excess base material
- Plate Compactor NorthStar — Re-compacting the adjusted base
- Shovel — Precisely leveling and moving stone
- String Line — Acting as a precise level guide
- Tape Measure — Measuring and verifying base height