Excavate New Trench
1:39
15:59
76.2K views
At 1:39 in
Double Terraced wall Crashes down pt1
What happens here
After demolition, use a mini excavator to dig a new trench along the desired line of the retaining wall. The trench should be approximately 2 feet wide and 1 foot below grade. This depth allows for a 6-inch rock base and the first 6-inch block course to be buried, creating a stable foundation for the wall. Use a shovel and digging bar for areas the mini excavator cannot precisely reach.
Goal: Create a properly sized and located trench for the new retaining wall foundation.
Tools and materials
- Digging Bar — Breaking up compacted soil or removing stubborn debris
- Mini Excavator Bobcat — Digging the main trench
- Shovel — Fine-tuning the trench contours and clearing tight spots
- String Line — Providing a visual guide for excavation
- Tape Measure — Measuring trench width and depth