Excavate Trench and Prepare Base

3:57
15:42
214.8K views

At 3:57 in

Deck Inspection Brings Our Job to a DEAD stop.

What happens here

Workers excavate a trench parallel to the existing deck posts and the house foundation. The depth and width of the trench are determined by the retaining wall's design and local code requirements. Once the trench is dug, a layer of gravel is added to create a stable and well-draining base for the concrete retaining wall blocks. This gravel layer is then thoroughly compacted using a plate compactor to ensure a solid, level foundation for the wall.

Goal: A trench is excavated along the base of the deck posts where the new retaining wall will be built, followed by laying and compacting a gravel base.

Tools and materials

  • Gravel
  • Plate Compactor
  • Shovels