Backfill and Compact Soil
At 11:42 in
Deck Inspection Brings Our Job to a DEAD stop.
What happens here
Once the retaining wall reaches the desired height, the area behind it is backfilled with soil and gravel. A skid steer is used to efficiently move large quantities of material, while shovels and rakes are employed for precise placement and leveling. The backfill material is spread in layers and compacted regularly to prevent settling and ensure proper drainage. This process is crucial for the structural integrity of the retaining wall and the overall stability of the supported deck posts.
Goal: Soil and gravel are backfilled behind the completed retaining wall using a skid steer and hand tools, with careful compaction to ensure stability and drainage.
Tools and materials
- Gravel
- Shovels and Rakes
- Skid Steer
- Soil