Pool Demolition and Debris Loading
3:19
32:37
86K views
At 3:19 in
Day at Work digging, Mowing, & bidding 2 Big retaining Wall Failures
What happens here
This comprehensive step covers the full process of swimming pool demolition and the subsequent loading of concrete debris. The crew uses an ASV RT-75 compact track loader equipped with a grapple attachment to systematically break apart the pool structure. Pieces of the concrete and other debris are then carefully lifted and loaded into a large red dump truck, branded 'GENADEK', which is positioned strategically on a dirt ramp to facilitate easier and safer loading, minimizing impact on the truck bed.
Goal: Efficiently demolish a swimming pool and load all debris for recycling or disposal.
Tools and materials
- ASV RT-75 Compact Track Loader ASV — Breaking down pool walls and lifting debris
- Dump Truck GENADEK — Transporting demolished concrete and debris
- Grapple Attachment — Gripping and loading concrete pieces
- Hard Hat — Head protection on a demolition site
- Hearing Protection — Protecting ears from loud machinery
- Dirt/Fill Material Local supplier — Creating a ramp for debris loading
What they say
(1,326 characters)Hide
What they say
(1,326 characters)Auto-generated from the video audio.