Skip to main content

Prepare for Waterproofing and Backfill

8:04
15:56
95.5K views

At 8:04 in

Day 2: Emergency Foundation repair

What happens here

Before backfilling, apply tar paper to the exterior of the foundation wall to provide a waterproofing layer. Simultaneously, transport 1.5-inch clear rock (aggregate) from an aggregate pit using a front-end loader and trailer to the job site. This aggregate will be used for effective drainage during backfilling.

Goal: Prepare the foundation wall for backfilling by applying tar paper for waterproofing and gathering drainage aggregate.

Tools and materials

  • Front-end Loader
  • Tar Paper
  • Trailer
  • 1.5-inch Clear Rock Aggregate

What they say

Hide

one last crank while Frankie watches the inside of the garage wall to make sure that everything is exactly where he wants it if you look down the string line now roof everything's in oh yeah all right Frankie what's the next step sometime people for water proofing while Frankie fine-tunes the foundation wall and gets a krumper back though Alyx runs to the aggregate pit and picks up inch and a half clear rock [Music] but before we can backfill we've got a corphal okay

Auto-generated from the video audio.