Skip to main content

Install Ground Anchors ('Dead Men')

1:44
15:56
95.5K views

At 1:44 in

Day 2: Emergency Foundation repair

What happens here

Excavate trenches to the required depth and length, parallel to the foundation wall. Carefully lower timber 'dead men' into these trenches. These anchors will provide resistance against the bowed foundation wall when connected by tensioned cables.

Goal: Dig trenches and place timber 'dead men' (ground anchors) into position, preparing them for connection to the foundation wall.

Tools and materials

  • Mini Excavator
  • Shovels
  • Timber 'Dead Men'

What they say

Hide

back filled with the right material [Music] yesterday we were able to get one dead men in place today our goal is to get two more to connect the dead men to the garage wall they've got to puncture a hole through the garage and they're wrapping the cable around the core fills

Auto-generated from the video audio.