Construct Privacy Berm with Buried Organics
At 7:56 in
Cutting in a Driveway and Building a Privacy berm #1
What happens here
The skid steer is used to construct the privacy berm. Instead of completely removing the organic material from the clearing process, felled trees and other woody debris are pushed into the base of the berm. Excavated soil, primarily sandy material from the property, is then pushed over and around these organic components. This process 'encapsulates' the organic material. The operator explains that as the buried wood slowly decays, it will help bind the sandy soil, creating a more stable and robust berm that can naturally support wildflowers and other vegetation over time. The berm is initially built to approximately 4 feet tall and gradually widened and heightened.
Goal: Build the privacy berm by pushing excavated soil and integrating felled trees and organic material directly into the mound, rather than removing them.
Tools and materials
- Kubota SVL 75-2 Skid Steer
- Standard Bucket Attachment
- Excavated Soil (sandy) N/A
- Felled Trees/Organic Material N/A
What they say
(535 characters)Hide
What they say
(535 characters)Auto-generated from the video audio.